Plumbing · Fire Suppression · Piping

OSHA Compliance Docs for Commercial Plumbing Contractors

Written safety programs, confined space entry procedures, trench safety plans, and complete prequalification packets — built for plumbing work. Ready in minutes.

50

Pages in a typical plumbing safety program

Confined space + trench/excavation adds depth

9

Trade-specific OSHA programs

Confined space, trench, HazCom, fall, LOTO + 4 more

11

Minutes to generate

From blank to GC-ready bid packet

$500

Max monthly cost — trivial vs. bid value

A $500K contract starts with a $1,500 compliance packet

Plumbing-Specific

9 Written Programs — Built for Plumbing Work

Plumbing's unique hazards — confined spaces, excavation, chemical exposure — require programs that generic templates never address. TradePack covers every one.

Confined Space Entry Program — OSHA 29 CFR 1910.146
Excavation & Trenching Safety Program — OSHA 1926.650
Hazard Communication / SDS Management (HazCom)
Lockout/Tagout (LOTO) — Plumbing Systems Isolation
Personal Protective Equipment (PPE) Program
Fall Protection Program (Elevated Pipe Work)
Ladder Safety — OSHA 29 CFR 1926.1053
Respiratory Protection (Solvent Cement, Mold, H₂S)
Incident Reporting & OSHA 300 Log Management

All programs are generated with your company name, license number, and plumbing-specific language. Not left blank for you to fill in.

GC Prequalification

What GCs Require from Every Plumbing Sub

Confined space entry and excavation programs are hard requirements on most commercial plumbing scopes involving underground work. Missing either one gets you disqualified before a GC reads your bid number.

See a complete plumbing bid packet →
Written OSHA 1926 Safety Program — plumbing-specific
Confined space entry program (manholes, crawlspaces, pipe chases)
Excavation & trenching program for underground work
HazCom / SDS program covering pipe cement, primers, flux
EMR at or below 1.0 (below 0.85 for Tier 1 GCs)
General Liability: $2M per occurrence minimum
Workers Compensation with statutory limits
COI with blanket additional insured endorsement
Plumbing contractor license — state-issued

From Blank to Bid-Ready in Three Steps

No lawyers, no safety consultants, no weeks of back-and-forth.

Step 01

Answer 12 Questions

Tell us your trade scope (above-ground, underground, fire suppression), license number, crew size, and insurance details. 10–15 minutes.

Step 02

TradePack Assembles Your Packet

We generate your OSHA programs — including confined space entry and trenching — plus your COI summary, company overview, and EMR letter.

Step 03

Submit to GC Portals

Download as a bundled PDF or organised ZIP. Submit to Procore, Textura, or any GC prequalification portal.

Plumbing Compliance Questions

Does TradePack generate a confined space entry program for plumbing? +
Yes — and this is one of the most commonly missing documents for plumbing subs bidding commercial work. TradePack generates a written confined space entry program per OSHA 29 CFR 1910.146 that covers permit-required confined spaces, atmospheric testing requirements, attendant and entrant duties, and rescue procedures. If you do any work in manholes, crawlspaces, or large pipe chases, you need this.
My scope is all above-ground — do I still need excavation and trenching? +
If you never do underground work, we skip excavation and trenching programs. When you describe your scope during setup, TradePack only generates programs applicable to work you actually perform — you won't pay for programs you don't need or hand GCs a document that contradicts your actual scope.
Do I need a HazCom program just for pipe cement and primer? +
Yes. OSHA's Hazard Communication Standard (29 CFR 1910.1200) applies whenever employees are exposed to hazardous chemicals — and pipe cement, primer, and soldering flux all qualify. Your written HazCom program needs to address SDS management, labeling, and employee training. TradePack generates this with plumbing-specific chemical examples already written in.
What if I do both commercial new construction and service/maintenance? +
TradePack generates a blended program that covers both 29 CFR 1926 (construction) and 29 CFR 1910 (general industry) as applicable to your scope. When you describe your work types, we include the relevant programs and language for each.

Stop Losing Commercial Plumbing Bids to Paperwork

Take the free compliance audit — find out exactly what documents you're missing before your next GC prequalification request.

Get My Free Plumbing Compliance Audit →